24 September 2026
Updated 24 September 2026
How to run a studio drawing register with stable references, review status, and blocked-sheet visibility.
A drawing register is useful only when every sheet has one reference, one current status, and one visible owner. Beech keeps those together so updates do not drift across spreadsheets and chat.
Start with stable references
Define section codes and sequence ranges first. Use one reference pattern for the whole project so revision history stays attached to each drawing over time.
Track progress with review context
A sheet is not really done until review outcomes are recorded. Link review state to each drawing so leadership can distinguish in-progress, waiting review, and approved sheets.
Surface blocked sheets early
Model dependencies and consultant waits directly against drawings. Weekly planning then shows where downstream work is blocked before deadlines slip.
Full reference: Drawing setup in the user guide
Related feature page: Explore feature workflow
Related reading: How drawing numbers work · Creating a revision · Drawing tasks vs general tasks