16 August 2026
Updated 16 August 2026 · Beech Product Education Team
Where to click after you log in, what the four main pages are for, and how to find your own work without learning the whole product at once.
Intent: Explain your first week in beech in a way that a new team member can follow without prior Beech context.
Who this helps: Architecture studio admins, managers, and contributors who need a repeatable operational workflow.
Beech is built for architecture studios: drawings with real numbers, a board for the work, sprints for the week, and a Home page that surfaces what needs your attention. You do not need every setting on day one. You need a loop you can repeat.
The four places you will live
- Home — blocked work, reviews waiting on you, vendors due, and today's work list.
- Projects — one client job. Open a project for Work, Log, Studio, Vault, Deliverables, and Info.
- Workspace — your board across every project you can see, including reviews and vendor requests.
- Schedule — the sprint. Managers plan it; contributors see their assigned sprint work.
More hides Firm board, Activity, Vendors, Library, Reports, Team Hours (Managers and Admins), and Firm settings. On a phone, those four destinations sit in a bottom tab bar.
What to do in the first few days
- 1Open Home
Click a summary chip (Blocked, For review, Vendors due) or an item in Today's work. That is usually faster than hunting through Projects.
- 2Find your tasks in Workspace
Filter by assignee (you) if the board is busy. Green In-sprint badges are this week's commitment.
- 3Learn one drawing number
Press Cmd+K (Mac) or Ctrl+K (Windows) and type a reference like RV01-FLP-005. Search is the fastest way back to a sheet.
If you cannot see a project
Only Admins see every project. Managers and Contributors see projects they are members of (or have work on). Ask a manager to add you on the project's Info tab, and check you accepted the invite with the same email you log in with.
Prerequisites
- Confirm you can access the project and the page referenced in this workflow.
- Collect any drawing references, due dates, and ownership details before you start.
Expected outcome
By the end of this workflow, your team has one visible, repeatable process and cleaner handovers.
Common mistakes and prevention
Mistake 1: Skipping context fields (owner, due date, status notes), which makes follow-up harder.
Mistake 2: Treating chat updates as source of truth instead of recording the update in Beech.
Troubleshooting checklist
- 1Troubleshooting step 1
If a control is missing, verify your role has permission for the action.
- 2Troubleshooting step 2
If results look wrong, check filters and refresh to confirm latest synced data.
Full reference: Welcome to Beech in the user guide
Related guides: Signup and first login checklist · Troubleshooting Beech workflows · Setting up a project