16 August 2026
Updated 16 August 2026 · Beech Product Education Team
Why drawing tasks wait on an approved review, when a manager can override, and how to turn the gate off for a project.
Intent: Explain getting a drawing to done in a way that a new team member can follow without prior Beech context.
Who this helps: Architecture studio admins, managers, and contributors who need a repeatable operational workflow.
By default a drawing cannot sit in Done until internal review has approved it. That is the studio gate before a sheet goes to a client or vendor. General tasks skip this — they can be Done whenever the work is finished.
The usual path
- 1Finish the sheet
Move the task through To-Do and In-Progress. Attach the file from the task panel if you keep versions in Beech.
- 2Send for review
From the task panel, or by moving the card to In-Review. Pick one or more reviewers. Confirm with Send for review.
- 3Wait for Approved
When every reviewer approves, the drawing can reach Approved and the task can go to Done.
If you do not use formal review
Turn off Require drawing reviews in the project Info tab. Drawings can then be moved to Done directly. Admins and Managers can always move a drawing to Done, even when the gate is on.
Prerequisites
- Confirm you can access the project and the page referenced in this workflow.
- Collect any drawing references, due dates, and ownership details before you start.
Expected outcome
By the end of this workflow, your team has one visible, repeatable process and cleaner handovers.
Common mistakes and prevention
Mistake 1: Skipping context fields (owner, due date, status notes), which makes follow-up harder.
Mistake 2: Treating chat updates as source of truth instead of recording the update in Beech.
Troubleshooting checklist
- 1Troubleshooting step 1
If a control is missing, verify your role has permission for the action.
- 2Troubleshooting step 2
If results look wrong, check filters and refresh to confirm latest synced data.
Full reference: Reviews & Approvals in the user guide
Related guides: Drawing tasks vs general tasks · How drawing numbers work · Why a drawing is Blocked